Blueprint South Linden

South Linden is the third Blueprint Linden project area. The project boundaries are east of Joyce Ave. to Sunbury Rd., and runs south to Woodward Ave.

Surveying starts 2034

Design Details

Current Projects

Surveying starts 2034. More information will be available then!

South Linden Project Schedule

Phase 1

Surveying: 2030-2032

Surveyors are in the neighborhood to document water flow patterns, topography, existing utilities, and other residential infrastructure, such as downspouts.

Phase 2

Green Infrastructure Design: 2031-2033

The engineering team identifies the types and locations of green infrastructure that will meet the needs of the neighborhood. During the design phase, we seek resident feedback through surveys, public meetings, and field visits.

Learn More

Phase 3

Shovels in the Ground: 2033

Construction of green infrastructure involves work in the public right-of-way and street. All neighborhood residents will be notified of anticipated impacts, and Blueprint will send out weekly construction updates to keep everyone informed of the schedule and activities.

Learn More

Green Infrastructure Construction & Stream Restoration: 2035-2041

Rain gardens and porous pavement sites are installed. During this time other city infrastructure work may occur, such as waterline upgrades or sidewalk installations.

Mainline Lining: 2033-2036

This mainline lining (work to seal the main sewer lines on your streets) directly reduces water infiltration and inflow (I/I) into sanitary sewers. Over time, pipes can develop cracks and leaks, allowing rainwater to enter sanitary sewers, filling them beyond their capacity. Overwhelming the system can create a sewage overflow into rivers or back-ups into basements. The lining process quickly replaces an old pipe with minimal impact within the construction area.

Lateral Lining: 2036-2038

Individual homes are assessed for lateral lining and roofwater redirection. These home improvements prevent stormwater from entering the sanitary sewer lines by getting that water away from your home and out to the street, so it can drain to the storm sewer system

Sump Pumps: 2036-2038

All homes in the project area are eligible to receive a sump pump if residents do not have one, or if the current pump is in disrepair. Visit our sump pump project page to learn more.

Roofwater Redirection: 2040-2043

Individual homes are assessed for lateral lining and roofwater redirection. These home improvements prevent stormwater from entering the sanitary sewer lines by getting that water away from your home and out to the street, so it can drain to the storm sewer system

Project Milestones & Events

Preliminary Design Meeting

2036

More to Come!

Detailed Design Meeting

2036

More to Come!

Final Design

2037

More to Come!

Pre-Construction Meeting

2037

More to Come!

See What’s Planned

Green Infrastructure Locations

See where green infrastructure is planned in your neighborhood.

Nothing planned yet! Check back later.

Do you have a community meeting or event you would like Blueprint to attend? We’d love to be there!

Latest Updates

Keep up on the latest announcements in your neighborhood! Sign up for email or text notifications to make sure you stay informed.

Top