Construction Updates: Week of September 30, 2024

Please note that construction schedules are subject to change due to weather, site issues, etc. Reference this MAP to view the impacted construction areas for next week. Unsure about which is your area? Visit the Blueprint- map and type in your address to find out!

Sump pump installations are offered for a limited time only! We have a few spots left on our list! If you are interested, contact us ASAP and we’ll schedule your no-obligation assessment to see if a sump pump is right for you!

General Updates

If you have a basement backup (sewer water coming up from your floor drain), please report this to the City by calling 614-645-7102. Please note that crews are working diligently to investigate issues throughout the city, and so we may not be able to respond immediately. We appreciate your patience and understanding.

PROJECT STATUS

Sunrise-Glenn Construction Update – Week of September 30, 2024

 

Reference this MAP to view the impacted construction areas.

Area 1: Basin, curb and sidewalk work — W 6th Ave & Broadview (9/30 – 10/11)

Area 2: Basin, planter & sidewalk work — Wyandotte, Elmwood, and Ashland (10/1 – 10/11)

Area 3: Basin excavation & planter work — W 6th Ave between Grandview & Northwest Blvd (9/30 – 10/11)

Area 4: Basin & planter work — W 7th Ave (10/1 – 10/4)

Area 5: Install fire hydrants — Fairview Ave (10/3 – 10/8)

 

NOTE: Limited Lane/Street Closures are possible.

Concrete sidewalk replacement to be performed as needed to maintain pedestrian traffic. Continuation of waterline shuts to perform pavement replacement as needed to maintain traffic. If there is any impact on water service, affected individuals will receive advance notice and relevant information directly. To minimize the impact of daytime water service loss, some work may be conducted at night. 

Design Stage

90%

Current Projects

Fifth X Northwest is divided into two separate project areas. Both project areas are in the Grandview Heights neighborhood sitting just north of W 3rd Ave.

Sunrise / Glenn: The majority of the Sunrise/Glenn project area is located between W 3rd Ave and King Ave. The western boundary is Northwest Blvd and the eastern boundary is Wyandotte Rd.  A small section of the project area goes as far north as Presidential Dr. 

Edgehill / Meadow: The majority of the Edgehill/Meadow project area is located between W 3rd Ave and King Ave. The eastern boundary is Northwest Blvd and the wester boundary is Olentangy River Rd. 

 

5th x NW Project Map

5th x Northwest Project Schedule

Phase 1

Surveying: 2016

Surveyors are in the neighborhood to document water flow patterns, topography, existing utilities, and other residential infrastructure, such as downspouts.

Phase 2

Green Infrastructure Design: 2018-2023

The engineering team identifies the types and locations of green infrastructure that will meet the needs of the neighborhood. During the design phase, we seek resident feedback through surveys, public meetings, and field visits.

Learn More

Phase 3

Shovels in the Ground: 2024

Construction of green infrastructure involves work in the public right-of-way and street. All neighborhood residents will be notified of anticipated impacts, and Blueprint will send out weekly construction updates to keep everyone informed of the schedule and activities.

Learn More

Green Infrastructure Construction: 2024

Rain gardens and porous pavement sites are installed. During this time other city infrastructure work may occur, such as waterline upgrades or sidewalk installations.

Lateral Lining and Roofwater Redirection: 2025

Individual homes are assessed for lateral lining and roofwater redirection. These home improvements prevent stormwater from entering the sanitary sewer lines by getting that water away from your home and out to the street, so it can drain to the storm sewer system

Project Milestones & Events

Preliminary Design Meeting

August 8, 2018

August 8, 2018

Detailed Design Meeting

April 21, 2021

Meeting Recap

Final Design

S/G -June 30, 2022

E/M -May 11.2023 

Watch Video

Pre-Construction Meeting

S/G -APRIL 30, 2024

WATCH VIDEO

Do you have a community meeting or event you would like Blueprint to attend? We’d love to be there!

Latest Updates

Keep up on the latest announcements in your neighborhood! Sign up for email or text notifications to make sure you stay informed.

Top