Fifth X Northwest is divided into two separate project areas: Sunrise / Glenn and Edgehill / Meadow. Both project areas are in the Grandview Heights neighborhood sitting just north of W 3rd Ave.

Design Stage

90%

Current Projects

Fifth X Northwest is divided into two separate project areas. Both project areas are in the Grandview Heights neighborhood sitting just north of W 3rd Ave.

Sunrise / Glenn: The majority of the Sunrise/Glenn project area is located between W 3rd Ave and King Ave. The western boundary is Northwest Blvd and the eastern boundary is Wyandotte Rd.  A small section of the project area goes as far north as Presidential Dr. 

Edgehill / Meadow: The majority of the Edgehill/Meadow project area is located between W 3rd Ave and King Ave. The eastern boundary is Northwest Blvd and the wester boundary is Olentangy River Rd. 

 

5th x NW Project Map

5th x Northwest Project Schedule

Phase 1

Surveying: 2016

Surveyors are in the neighborhood to document water flow patterns, topography, existing utilities, and other residential infrastructure, such as downspouts.

Phase 2

Green Infrastructure Design: 2018-2023

The engineering team identifies the types and locations of green infrastructure that will meet the needs of the neighborhood. During the design phase, we seek resident feedback through surveys, public meetings, and field visits.

Learn More

Phase 3

Shovels in the Ground: 2024

Construction of green infrastructure involves work in the public right-of-way and street. All neighborhood residents will be notified of anticipated impacts, and Blueprint will send out weekly construction updates to keep everyone informed of the schedule and activities.

Learn More

Green Infrastructure Construction: 2024

Rain gardens and porous pavement sites are installed. During this time other city infrastructure work may occur, such as waterline upgrades or sidewalk installations.

Lateral Lining and Roofwater Redirection: 2025

Individual homes are assessed for lateral lining and roofwater redirection. These home improvements prevent stormwater from entering the sanitary sewer lines by getting that water away from your home and out to the street, so it can drain to the storm sewer system

Project Milestones & Events

Preliminary Design Meeting

August 8, 2018

August 8, 2018

Detailed Design Meeting

April 21, 2021

Meeting Recap

Final Design

S/G -June 30, 2022

E/M -May 11.2023 

Watch Video

Pre-Construction Meeting

 

Coming 2024

Do you have a community meeting or event you would like Blueprint to attend? We’d love to be there!

Latest Updates

Keep up on the latest announcements in your neighborhood! Sign up for email or text notifications to make sure you stay informed.

Top