The West Franklinton is comprised of two separate project areas: Yale / Edwin and Green / Glenwood. Both project areas are contained by W Broad St to the North and W Mound St to the South.
Is this your first time? Make sure you find out which Blueprint Neighborhood you are in with our interactive map.
The West Franklinton is comprised of two separate project areas: Yale / Edwin and Green / Glenwood. Both project areas are contained by W Broad St to the North and W Mound St to the South.
Design work starts in 2023. More information will be available then!
Surveyors are in the neighborhood to document water flow patterns, topography, existing utilities, and other residential infrastructure, such as downspouts.
The engineering team identifies the types and locations of green infrastructure that will meet the needs of the neighborhood. During the design phase, we seek resident feedback through surveys, public meetings, and field visits.
Learn MoreConstruction of green infrastructure involves work in the public right-of-way and street. All neighborhood residents will be notified of anticipated impacts, and Blueprint will send out weekly construction updates to keep everyone informed of the schedule and activities.
Learn MoreRain gardens and porous pavement sites are installed. During this time other city infrastructure work may occur, such as waterline upgrades or sidewalk installations.
Individual homes are assessed for lateral lining and roofwater redirection. These home improvements prevent stormwater from entering the sanitary sewer lines by getting that water away from your home and out to the street, so it can drain to the storm sewer system