Livingston-James 4

Blueprint Livingston-James 4

The Livingston-James project areas comprise 4,701 acres located in central-east Columbus. This has been identified as a Blueprint priority area due to a high number of basement backups that are clustered throughout the project area. The sanitary sewer overflow associated with this area occurs in a main sewer line, and must be addressed through system-wide improvements.

Surveying starts 2033

Design Details

Current Projects

Surveying starts in 2033. More information will be available then!

Livingston-James 4 Project Schedule

Phase 1

Surveying: 2033-2034

Surveyors are in the neighborhood to document water flow patterns, topography, existing utilities, and other residential infrastructure, such as downspouts.

Phase 2

Green Infrastructure Design: 2034-2037

The engineering team identifies the types and locations of green infrastructure that will meet the needs of the neighborhood. During the design phase, we seek resident feedback through surveys, public meetings, and field visits.

Learn More

Phase 3

Shovels in the Ground: 2037

Construction of green infrastructure involves work in the public right-of-way and street. All neighborhood residents will be notified of anticipated impacts, and Blueprint will send out weekly construction updates to keep everyone informed of the schedule and activities.

Learn More

Green Infrastructure Construction: 2037

Rain gardens and porous pavement sites are installed. During this time other city infrastructure work may occur, such as waterline upgrades or sidewalk installations.

Lateral Lining and Roofwater Redirection: 2039

Individual homes are assessed for lateral lining and roofwater redirection. These home improvements prevent stormwater from entering the sanitary sewer lines by getting that water away from your home and out to the street, so it can drain to the storm sewer system

Project Milestones & Events

Preliminary Design Meeting

2034

Meeting Details

Detailed Design Meeting

2035

Meeting Details

Final Design

2036

Meeting Details

Pre-Construction Meeting

2037

Meeting Details

See What’s Planned

Green Infrastructure Locations

See where green infrastructure is planned in your neighborhood.

Newton-Bedford

Kelton-Fairwood

Do you have a community meeting or event you would like Blueprint to attend? We’d love to be there!

Latest Updates

Keep up on the latest announcements in your neighborhood! Sign up for email or text notifications to make sure you stay informed.

Top